FHWA BIM workflow
The four BIM workflow groups of FHWA-HIF-24-004. A use case belongs to exactly one.
Source: FHWA-HIF-24-004, Building Information Modeling (BIM) Workflows and Centralized BIM Transportation Library for Bridges and Roadways, January 2024
| Code | Label | Definition |
|---|---|---|
| PSD | Planning, Survey and Design | BIM Workflow 1: planning, survey, conceptual and preliminary design. |
| DA | Design and Analysis | BIM Workflow 2: preliminary and detailed design, structural analysis, final design. |
| DC | Design and Construction | BIM Workflow 3: final design, contractor delivery, fabrication and construction, inspection, acceptance and payment. |
| DCA | Design, Construction, and Asset Management | BIM Workflow 4: as-built delivery, in-service safety inspection, condition assessment and load rating. |