FHWA priority use case

The ten priority BIM use cases of FHWA-HIF-24-004. The code is the workflow prefix and the use case's number in the source's master list.

Source: FHWA-HIF-24-004, Building Information Modeling (BIM) Workflows and Centralized BIM Transportation Library for Bridges and Roadways, January 2024

CodeLabelDefinition
PSD.1Create Project Scoping Documents for Design Engineers from Planning DataPlanning data is turned into scoping documents a design engineer can start from. Workflow PSD.
PSD.3Create Visualizations for Alternatives Analysis and Public OutreachModels and visualizations used to compare alternatives and to explain them to the public. Workflow PSD. The source refers to it once as PSD.2 in its section 2.3.
DA.9Provide Data for Interdisciplinary Coordination and Clash DetectionDiscipline models are shared and checked against each other for conflicts. Workflow DA.
DA.11Develop Final Structural Analysis ModelThe structural analysis model that supports the final design. Workflow DA.
DA.12Produce Final Plans and ModelThe final plans and the model delivered with them. Workflow DA.
DC.2Create Detailed Quantity Take-off and EstimateQuantities taken from the model to build a detailed estimate. Workflow DC.
DC.3Provide Design Information for Automated Machine GuidanceDesign information prepared so construction equipment can be guided by it. Workflow DC.
DC.6Develop and Review Shop Drawings and ModelsFabricator and contractor shop drawings and models, and their review. Workflow DC.
DC.7Verify Construction Results and Record As-Built DataConstruction is checked against the design and the as-built data is recorded. Workflow DC.
DCA.3Provide In-Service Bridge Safety Inspection Data for Asset ManagementInspection data from a bridge in service is delivered to asset management. Workflow DCA.